We carry out terraced house loft conversions for homeowners in Woking and across Surrey. A typical project here costs £48,000 to £77,500 including VAT and takes 6 to 10 weeks on site.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Terraced House Loft Conversions in Woking

Terraced House Loft Conversions for homes in Woking

Our team covering Surrey works in Woking and nearby Chertsey, Weybridge, Guildford. Travel is included in every quote, so there are no call-out charges for the survey.

Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.

What does a terraced house loft conversion cost in Woking?

In Woking a terraced house loft conversion usually falls between £48,000 and £77,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.

Guide price in Woking£48,000 to £77,500 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • Scaffolding on a terrace with no rear access is taken through the house or bridged over from the street.
  • Sound insulation is added to the new floor so footsteps do not carry to the bedrooms below.
  • Terraced houses have a permitted development allowance of 40 cubic metres of added roof volume in England.
  • Steel beams normally bear on the party walls, so notice under the Party Wall etc. Act 1996 is needed in England and Wales.

Why use us in Woking?

  • Snagging visit after completion.
  • Structural engineer's calculations on every project.
  • One contract for design, approvals and building, with a named project manager.
  • Written, itemised quote after a free survey.

Planning and building control in Woking

Rear dormers on terraced houses are usually permitted development within the 40 cubic metre limit; flats and maisonettes within terraces need planning permission.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Terraced House Loft Conversions in Woking: your questions

Do I need planning permission in Woking?

Rear dormers on terraced houses are usually permitted development within the 40 cubic metre limit; flats and maisonettes within terraces need planning permission. We confirm the position with the local planning authority before work starts.

Do you cover Woking?

Yes. We carry out terraced house loft conversions in Woking and throughout Surrey. Surveys are free and without obligation.

How soon can you start in Woking?

Design and approvals usually take six to ten weeks. Building work in Surrey is then scheduled for the next available start date, which we confirm in writing.

Is there enough space under permitted development?

Usually. A rear dormer on a typical two-bedroom terrace is around 25 to 35 cubic metres. We calculate it on the drawings.

How is scaffolding put up at the back with no side access?

Scaffold tubes and boards are carried through the house with floor protection, or a bridge scaffold is built over the roof from the front.

Call usGet a quote