Dormer Loft Conversions in Woking
A dormer loft conversion in Woking typically costs £48,000 to £74,000 including VAT. We start with a free home survey to measure head height and check the roof structure.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Woking
Woking is a large town or city in Surrey, about 13 miles from Slough. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a dormer loft conversion cost in Woking?
Our guide price in the South East for a dormer loft conversion is £48,000 to £74,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Woking | £48,000 to £74,000 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.
- Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
- Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
- The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
Why use us in Woking?
- Structural engineer's calculations on every project.
- One contract for design, approvals and building, with a named project manager.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- Written, itemised quote after a free survey.
Planning and building control in Woking
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Dormer Loft Conversions in Woking: your questions
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
Is the survey in Woking really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How soon can you start in Woking?
Design and approvals usually take six to ten weeks. Building work in Surrey is then scheduled for the next available start date, which we confirm in writing.
How long does a dormer loft conversion take?
Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.
Can a dormer go on the front of the house?
It can, but a front dormer that faces a road is outside permitted development, so it needs planning permission and is usually a smaller pitched-roof design.