Terraced House Loft Conversions in Cirencester
Planning a terraced house loft conversion in Cirencester? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £44,000 to £71,000 including VAT for Gloucestershire.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Terraced House Loft Conversions for homes in Cirencester
Cirencester, 13 miles from Cheltenham, is within the part of Gloucestershire we cover. We also work in Stroud, Cheltenham, Gloucester.
Natural slate roofs are common, so matching slate for dormer cheeks and roof repairs is part of most quotes.
What does a terraced house loft conversion cost in Cirencester?
Prices in Cirencester follow our guide rate for the South West, which is about 3% above the national guide. That puts a terraced house loft conversion at £44,000 to £71,000 including VAT. Your fixed quote follows the survey and sets out each stage payment.
| Guide price in Cirencester | £44,000 to £71,000 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Sound insulation is added to the new floor so footsteps do not carry to the bedrooms below.
- Adding a storey makes the house three storeys, so the stair route to the front door is protected with fire doors.
- Steel beams normally bear on the party walls, so notice under the Party Wall etc. Act 1996 is needed in England and Wales.
- Terraced houses have a permitted development allowance of 40 cubic metres of added roof volume in England.
Why use us in Cirencester?
- Building regulations inspections booked and attended by us.
- Written, itemised quote after a free survey.
- Clear start date and weekly progress updates.
- Snagging visit after completion.
Planning and building control in Cirencester
Rear dormers on terraced houses are usually permitted development within the 40 cubic metre limit; flats and maisonettes within terraces need planning permission.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Terraced House Loft Conversions in Cirencester: your questions
How long will the work take?
A terraced house loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.
How soon can you start in Cirencester?
Design and approvals usually take six to ten weeks. Building work in Gloucestershire is then scheduled for the next available start date, which we confirm in writing.
Is the survey in Cirencester really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How is scaffolding put up at the back with no side access?
Scaffold tubes and boards are carried through the house with floor protection, or a bridge scaffold is built over the roof from the front.
Is there enough space under permitted development?
Usually. A rear dormer on a typical two-bedroom terrace is around 25 to 35 cubic metres. We calculate it on the drawings.