Loft Conversion Company

Truss Roof Loft Conversions in Cirencester

Truss Roof Loft Conversions in Cirencester are designed and built by one team, from the first survey to the completion certificate. Guide price in Cirencester: £47,000 to £75,000 including VAT.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Truss Roof Loft Conversions in Cirencester

Truss Roof Loft Conversions for homes in Cirencester

As a town in Gloucestershire, about 13 miles from Cheltenham, Cirencester has a mix of house types, and the right loft design depends on the roof you have.

The mix runs from stone terraces to post-war bungalows, and many towns have conservation areas where roof changes are controlled.

What does a truss roof loft conversion cost in Cirencester?

In Cirencester a truss roof loft conversion usually falls between £47,000 and £75,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.

Guide price in Cirencester£47,000 to £75,000 inc. VAT
Typical duration7 to 11 weeks on site
Survey and quoteFree

Key facts

  • The engineer's calculations are submitted to building control before structural work starts.
  • Estate houses built after 2000 often already have good roof insulation, which is upgraded to current standards at rafter level.
  • The usual method is a pair of steel beams at floor level and new rafters or purlin beams sistered to the trusses.
  • Trussed rafters work as a whole frame, so cutting any member without new support risks the roof and ceilings.

Why use us in Cirencester?

  • One contract for design, approvals and building, with a named project manager.
  • Snagging visit after completion.
  • Stage payments tied to completed work, not dates.
  • Daily tidy-up and floor protection on the route to the loft.

Planning and building control in Cirencester

Planning rules are the same as for any other roof; the difference with a trussed roof is the structural design.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Truss Roof Loft Conversions in Cirencester: your questions

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

How long will the work take?

A truss roof loft conversion typically takes 7 to 11 weeks on site. Weather and any changes you make to the design can alter that.

Who deals with building control in Cirencester?

We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.

How do I know if I have a trussed roof?

Look in the loft. If you see many thin timbers forming repeated W shapes joined with metal plates, at about 600mm spacing, it is a trussed rafter roof.

How long does it take?

Allow 7 to 11 weeks on site.

Call usGet a quote