For a shell-only loft conversion in Dudley, expect a guide price of £24,500 to £46,000 including VAT and around 3 to 6 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Dudley

Shell-Only Loft Conversions for homes in Dudley

Dudley is a large town or city in the West Midlands, about 6 miles from Wolverhampton. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Inter-war semis with hipped roofs are everywhere, which makes hip to gable with a rear dormer the standard job.

What does a shell-only loft conversion cost in Dudley?

Our guide price in the West Midlands for a shell-only loft conversion is £24,500 to £46,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in Dudley£24,500 to £46,000 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • First-fix cables and pipes are usually best included in the shell so they are in before insulation and boarding.
  • We provide the engineer's details and drawings your finishing trades need.
  • The stair is fitted as part of the shell so trades have safe access.
  • Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.

Why use us in Dudley?

  • Stage payments tied to completed work, not dates.
  • Building regulations inspections booked and attended by us.
  • Structural engineer's calculations on every project.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.

Planning and building control in Dudley

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  4. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

Shell-Only Loft Conversions in Dudley: your questions

Who deals with building control in Dudley?

We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.

Do you cover Dudley?

Yes. We carry out shell-only loft conversions in Dudley and throughout the West Midlands. Surveys are free and without obligation.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

Who gets the building regulations certificate?

Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.

How long does it take?

Allow 3 to 6 weeks on site to shell stage.