For a mansard loft conversion in Maidstone, expect a guide price of £68,500 to £108,000 including VAT and around 10 to 14 weeks on site. One company handles design, approvals and construction.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Mansard Loft Conversions for homes in Maidstone
Our team covering Kent works in Maidstone and nearby Chatham, Rochester, Gillingham. Travel is included in every quote, so there are no call-out charges for the survey.
Commuter towns have a lot of 1930s to 1960s housing with good roof pitches for conversion.
What does a mansard loft conversion cost in Maidstone?
In Maidstone a mansard loft conversion usually falls between £68,500 and £108,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Maidstone | £68,500 to £108,000 inc. VAT |
|---|---|
| Typical duration | 10 to 14 weeks on site |
| Survey and quote | Free |
Key facts
- A mansard almost always needs planning permission because it changes the shape and height of the roof.
- Many London boroughs publish design guidance that favours mansards over box dormers on Victorian terraces.
- A mansard typically gives near full-height walls across the whole floor, enough for two rooms and a bathroom.
- Because the whole roof comes off, a temporary tin-hat scaffold roof is normally used to keep the house dry.
Why use us in Maidstone?
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- Building regulations inspections booked and attended by us.
- Daily tidy-up and floor protection on the route to the loft.
- Written, itemised quote after a free survey.
Planning and building control in Maidstone
Mansard conversions normally need a householder planning application; we prepare the drawings and manage the application.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Mansard Loft Conversions in Maidstone: your questions
Do you cover Maidstone?
Yes. We carry out mansard loft conversions in Maidstone and throughout Kent. Surveys are free and without obligation.
Will a loft conversion suit my house in Maidstone?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How long will the work take?
A mansard loft conversion typically takes 10 to 14 weeks on site. Weather and any changes you make to the design can alter that.
How much does a mansard loft conversion cost?
Our guide price for a rear mansard is £68,500 to £108,000 including VAT. Raising two party walls, a temporary roof and slate and lead finishes are why it costs more than a dormer.