Mansard Loft Conversions in Chatham

Mansard Loft Conversions for homes in Chatham

Chatham is a large town in Kent, about 1 miles from Gillingham. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.

What does a mansard loft conversion cost in Chatham?

The guide range for Chatham is £69,000 to £109,500 including VAT. Regional labour rates in the South East are about 12% above the national figure we use on the prices page.

Guide price in Chatham£69,000 to £109,500 inc. VAT
Typical duration10 to 14 weeks on site
Survey and quoteFree

Key facts

  • A double mansard converts the front slope as well as the rear and is treated as a full extra storey.
  • A mansard almost always needs planning permission because it changes the shape and height of the roof.
  • Many London boroughs publish design guidance that favours mansards over box dormers on Victorian terraces.
  • Butterfly (London) roofs are commonly converted with a mansard because they have no usable loft void.

Why use us in Chatham?

  • One contract for design, approvals and building, with a named project manager.
  • Clear start date and weekly progress updates.
  • Written, itemised quote after a free survey.
  • Building regulations inspections booked and attended by us.

Planning and building control in Chatham

Mansard conversions normally need a householder planning application; we prepare the drawings and manage the application.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

Mansard Loft Conversions in Chatham: your questions

Will a loft conversion suit my house in Chatham?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

How soon can you start in Chatham?

Design and approvals usually take six to ten weeks. Building work in Kent is then scheduled for the next available start date, which we confirm in writing.

Who deals with building control in Chatham?

We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.

Does a mansard need planning permission?

Yes in almost every case. A decision normally takes around eight weeks from validation, and we advise at survey on what your council has approved on nearby houses.

How long does a mansard take to build?

Allow 10 to 14 weeks on site after planning approval and party wall agreements are in place.