Loft Conversion Company

Dormer Loft Conversions in New Cross

Planning a dormer loft conversion in New Cross? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £53,000 to £82,000 including VAT for Greater London.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in New Cross

Dormer Loft Conversions for homes in New Cross

Our team covering Greater London works in New Cross and nearby Brockley, Greenwich, Peckham. Travel is included in every quote, so there are no call-out charges for the survey.

Inter-war semis in the outer boroughs are classic hip to gable candidates.

What does a dormer loft conversion cost in New Cross?

Our guide price in London for a dormer loft conversion is £53,000 to £82,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in New Cross£53,000 to £82,000 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • A Juliet balcony with inward-opening doors is a common addition on the rear face of a dormer.
  • Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.
  • Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
  • Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.

Why use us in New Cross?

  • One contract for design, approvals and building, with a named project manager.
  • Scaffold access through the roof, so the house stays usable.
  • Stage payments tied to completed work, not dates.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.

Planning and building control in New Cross

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  4. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

Dormer Loft Conversions in New Cross: your questions

Do I need planning permission in New Cross?

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

How much is a dormer loft conversion in New Cross?

Our guide price in New Cross is £53,000 to £82,000 including VAT. A fixed quote follows a survey of your loft.

Do I need planning permission for a dormer?

Often not. In England a rear dormer on a house normally counts as permitted development if the added roof volume stays within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house and the other conditions are met. Flats, conservation areas and front dormers usually need a planning application.

Will I have to move out?

No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.

Call usGet a quote