Dormer Loft Conversions in Greenwich
We carry out dormer loft conversions for homeowners in Greenwich and across Greater London. A typical project here costs £52,000 to £80,500 including VAT and takes 6 to 10 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Greenwich
Greenwich, 5 miles from Central London, is within the part of Greater London we cover. We also work in New Cross, Blackheath, Brockley.
Inter-war semis in the outer boroughs are classic hip to gable candidates.
What does a dormer loft conversion cost in Greenwich?
In Greenwich a dormer loft conversion usually falls between £52,000 and £80,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Greenwich | £52,000 to £80,500 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- A Juliet balcony with inward-opening doors is a common addition on the rear face of a dormer.
- Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
- Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.
- Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
Why use us in Greenwich?
- Structural engineer's calculations on every project.
- Building regulations inspections booked and attended by us.
- One contract for design, approvals and building, with a named project manager.
- Written, itemised quote after a free survey.
Planning and building control in Greenwich
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Dormer Loft Conversions in Greenwich: your questions
Do I need planning permission in Greenwich?
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How soon can you start in Greenwich?
Design and approvals usually take six to ten weeks. Building work in Greater London is then scheduled for the next available start date, which we confirm in writing.
Will I have to move out?
No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.
How long does a dormer loft conversion take?
Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.