Terraced House Loft Conversions in Stretford
We carry out terraced house loft conversions for homeowners in Stretford and across Greater Manchester. A typical project here costs £39,500 to £64,500 including VAT and takes 6 to 10 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Terraced House Loft Conversions for homes in Stretford
Our team covering Greater Manchester works in Stretford and nearby Old Trafford, Urmston, Sale. Travel is included in every quote, so there are no call-out charges for the survey.
Inter-war semis in the suburbs suit hip to gable conversions.
What does a terraced house loft conversion cost in Stretford?
Our guide price in the North West for a terraced house loft conversion is £39,500 to £64,500 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Stretford | £39,500 to £64,500 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- End-of-terrace houses with a hipped end can combine a hip to gable with the dormer.
- Adding a storey makes the house three storeys, so the stair route to the front door is protected with fire doors.
- The loft party walls are checked and made good so they give the required fire separation between houses.
- Chimney breasts in the loft can sometimes be removed to gain floor space, with the stack supported on steel.
Why use us in Stretford?
- Clear start date and weekly progress updates.
- Building regulations inspections booked and attended by us.
- Daily tidy-up and floor protection on the route to the loft.
- Scaffold access through the roof, so the house stays usable.
Planning and building control in Stretford
Rear dormers on terraced houses are usually permitted development within the 40 cubic metre limit; flats and maisonettes within terraces need planning permission.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Terraced House Loft Conversions in Stretford: your questions
How soon can you start in Stretford?
Design and approvals usually take six to ten weeks. Building work in Greater Manchester is then scheduled for the next available start date, which we confirm in writing.
Do I need planning permission in Stretford?
Rear dormers on terraced houses are usually permitted development within the 40 cubic metre limit; flats and maisonettes within terraces need planning permission. We confirm the position with the local planning authority before work starts.
Who deals with building control in Stretford?
We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.
How much does a loft conversion cost on a terraced house?
Our guide price is £39,500 to £64,500 including VAT for a rear dormer conversion with a bedroom and shower room. An L-shaped dormer or mansard costs more.
Is there enough space under permitted development?
Usually. A rear dormer on a typical two-bedroom terrace is around 25 to 35 cubic metres. We calculate it on the drawings.