Shell-Only Loft Conversions in Bromsgrove
Planning a shell-only loft conversion in Bromsgrove? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £24,500 to £46,000 including VAT for Worcestershire.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Bromsgrove
Bromsgrove, 11 miles from Dudley, is within the part of Worcestershire we cover. We also work in Redditch, Droitwich, Kidderminster.
Post-war and 1970s estates bring plenty of trussed roofs that need an engineer-led design.
What does a shell-only loft conversion cost in Bromsgrove?
Our guide price in the West Midlands for a shell-only loft conversion is £24,500 to £46,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Bromsgrove | £24,500 to £46,000 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
- A shell conversion typically costs around half to two-thirds of a fully finished one.
- We provide the engineer's details and drawings your finishing trades need.
- Building control still needs to inspect the later stages and issue the completion certificate after your finish.
Why use us in Bromsgrove?
- Scaffold access through the roof, so the house stays usable.
- Snagging visit after completion.
- Stage payments tied to completed work, not dates.
- Building regulations inspections booked and attended by us.
Planning and building control in Bromsgrove
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Shell-Only Loft Conversions in Bromsgrove: your questions
How soon can you start in Bromsgrove?
Design and approvals usually take six to ten weeks. Building work in Worcestershire is then scheduled for the next available start date, which we confirm in writing.
Is the survey in Bromsgrove really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
Who gets the building regulations certificate?
Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.
Is shell-only cheaper overall?
It can be if you do the finishing yourself. If you pay other trades at normal rates the saving is often small.