Shell-Only Loft Conversions in Dorking
A shell-only loft conversion in Dorking typically costs £27,000 to £50,500 including VAT. We start with a free home survey to measure head height and check the roof structure.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Dorking
Dorking, 11 miles from Crawley, is within the part of Surrey we cover. We also work in Leatherhead, Reigate, Redhill.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a shell-only loft conversion cost in Dorking?
Our guide price in the South East for a shell-only loft conversion is £27,000 to £50,500 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Dorking | £27,000 to £50,500 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- We provide the engineer's details and drawings your finishing trades need.
- Shell stage is agreed in writing so both sides know exactly where our work stops.
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
- A shell conversion typically costs around half to two-thirds of a fully finished one.
Why use us in Dorking?
- Written, itemised quote after a free survey.
- Structural engineer's calculations on every project.
- Snagging visit after completion.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
Planning and building control in Dorking
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Shell-Only Loft Conversions in Dorking: your questions
Is the survey in Dorking really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How soon can you start in Dorking?
Design and approvals usually take six to ten weeks. Building work in Surrey is then scheduled for the next available start date, which we confirm in writing.
Who deals with building control in Dorking?
We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.
Who gets the building regulations certificate?
Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.
Is shell-only cheaper overall?
It can be if you do the finishing yourself. If you pay other trades at normal rates the saving is often small.