Shell-Only Loft Conversions in Bath

Planning a shell-only loft conversion in Bath? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £24,000 to £45,000 including VAT for Somerset.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Bath

Shell-Only Loft Conversions for homes in Bath

Bath, 12 miles from Bristol, is within the part of Somerset we cover. We also work in Keynsham, Frome, Nailsea.

Bungalows near the coast are frequently converted to add bedrooms with a view.

What does a shell-only loft conversion cost in Bath?

Our guide price in the South West for a shell-only loft conversion is £24,000 to £45,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in Bath£24,000 to £45,000 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • The stair is fitted as part of the shell so trades have safe access.
  • A shell conversion typically costs around half to two-thirds of a fully finished one.
  • We provide the engineer's details and drawings your finishing trades need.
  • Building control still needs to inspect the later stages and issue the completion certificate after your finish.

Why use us in Bath?

  • Daily tidy-up and floor protection on the route to the loft.
  • Structural engineer's calculations on every project.
  • Snagging visit after completion.
  • Written, itemised quote after a free survey.

Planning and building control in Bath

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Shell-Only Loft Conversions in Bath: your questions

How long will the work take?

A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.

Is the survey in Bath really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How soon can you start in Bath?

Design and approvals usually take six to ten weeks. Building work in Somerset is then scheduled for the next available start date, which we confirm in writing.

How long does it take?

Allow 3 to 6 weeks on site to shell stage.

Who gets the building regulations certificate?

Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.