Loft Conversion Company

Shell-Only Loft Conversions in Market Harborough

For a shell-only loft conversion in Market Harborough, expect a guide price of £24,000 to £44,500 including VAT and around 3 to 6 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Market Harborough

Shell-Only Loft Conversions for homes in Market Harborough

Our team covering Leicestershire works in Market Harborough and nearby Wigston Magna, Evington, Oadby. Travel is included in every quote, so there are no call-out charges for the survey.

Red-brick terraces and inter-war semis dominate the older suburbs, with trussed roofs on the estates built since the 1970s.

What does a shell-only loft conversion cost in Market Harborough?

In Market Harborough a shell-only loft conversion usually falls between £24,000 and £44,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.

Guide price in Market Harborough£24,000 to £44,500 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • Building control still needs to inspect the later stages and issue the completion certificate after your finish.
  • First-fix cables and pipes are usually best included in the shell so they are in before insulation and boarding.
  • We provide the engineer's details and drawings your finishing trades need.
  • Shell stage is agreed in writing so both sides know exactly where our work stops.

Why use us in Market Harborough?

  • Snagging visit after completion.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.
  • Written, itemised quote after a free survey.
  • Scaffold access through the roof, so the house stays usable.

Planning and building control in Market Harborough

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Shell-Only Loft Conversions in Market Harborough: your questions

How long will the work take?

A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.

Will a loft conversion suit my house in Market Harborough?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

Who deals with building control in Market Harborough?

We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.

Who gets the building regulations certificate?

Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.

What is included at shell stage?

The structure, weatherproof envelope, windows and stairs as standard. Insulation and first-fix services are optional extras we recommend.

Call usGet a quote