Loft Conversion Company

Shell-Only Loft Conversions in Dover

Shell-Only Loft Conversions in Dover are designed and built by one team, from the first survey to the completion certificate. Guide price in Dover: £27,500 to £51,500 including VAT.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Dover

Shell-Only Loft Conversions for homes in Dover

Dover is a mid-sized town in Kent, about 36 miles from Maidstone. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Commuter towns have a lot of 1930s to 1960s housing with good roof pitches for conversion.

What does a shell-only loft conversion cost in Dover?

Our guide price in the South East for a shell-only loft conversion is £27,500 to £51,500 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in Dover£27,500 to £51,500 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • A shell conversion typically costs around half to two-thirds of a fully finished one.
  • Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
  • Shell stage is agreed in writing so both sides know exactly where our work stops.
  • Fire doors, smoke alarms and the protected stair are part of final sign-off, so they must be in your finishing scope.

Why use us in Dover?

  • Matching tiles, slate and brick sourced for a roofline that fits the street.
  • One contract for design, approvals and building, with a named project manager.
  • Scaffold access through the roof, so the house stays usable.
  • Structural engineer's calculations on every project.

Planning and building control in Dover

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  3. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Shell-Only Loft Conversions in Dover: your questions

How soon can you start in Dover?

Design and approvals usually take six to ten weeks. Building work in Kent is then scheduled for the next available start date, which we confirm in writing.

Is the survey in Dover really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

Do I need planning permission in Dover?

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected. We confirm the position with the local planning authority before work starts.

How much does a shell-only loft conversion cost?

Our guide price is £27,500 to £51,500 including VAT depending on the roof type and whether insulation and first fix are included.

How long does it take?

Allow 3 to 6 weeks on site to shell stage.

Call usGet a quote