Shell-Only Loft Conversions in Cheadle Hulme
Shell-Only Loft Conversions in Cheadle Hulme are designed and built by one team, from the first survey to the completion certificate. Guide price in Cheadle Hulme: £23,500 to £44,500 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Cheadle Hulme
Cheadle Hulme, 3 miles from Stockport, is within the part of Greater Manchester we cover. We also work in Bramhall, Stockport, Hazel Grove.
Brick terraces with slate roofs are the classic house type, and a rear dormer between the party walls is the usual design.
What does a shell-only loft conversion cost in Cheadle Hulme?
In Cheadle Hulme a shell-only loft conversion usually falls between £23,500 and £44,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Cheadle Hulme | £23,500 to £44,500 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
- The stair is fitted as part of the shell so trades have safe access.
- Fire doors, smoke alarms and the protected stair are part of final sign-off, so they must be in your finishing scope.
- Shell stage is agreed in writing so both sides know exactly where our work stops.
Why use us in Cheadle Hulme?
- Daily tidy-up and floor protection on the route to the loft.
- Stage payments tied to completed work, not dates.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- Snagging visit after completion.
Planning and building control in Cheadle Hulme
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Shell-Only Loft Conversions in Cheadle Hulme: your questions
How long will the work take?
A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.
Is the survey in Cheadle Hulme really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How much does a shell-only loft conversion cost?
Our guide price is £23,500 to £44,500 including VAT depending on the roof type and whether insulation and first fix are included.
Who gets the building regulations certificate?
Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.