Loft Conversion Company

Shell-Only Loft Conversions in Roehampton

For a shell-only loft conversion in Roehampton, expect a guide price of £29,500 to £55,500 including VAT and around 3 to 6 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Roehampton

Shell-Only Loft Conversions for homes in Roehampton

We cover Roehampton and the surrounding parts of Greater London, about 6 miles from Central London. Surveys are by appointment, including early evenings.

Many streets fall inside conservation areas or have Article 4 directions, so we check the borough's rules before sketching a dormer.

What does a shell-only loft conversion cost in Roehampton?

Prices in Roehampton follow our guide rate for London, which is about 25% above the national guide. That puts a shell-only loft conversion at £29,500 to £55,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.

Guide price in Roehampton£29,500 to £55,500 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • Shell stage is agreed in writing so both sides know exactly where our work stops.
  • Fire doors, smoke alarms and the protected stair are part of final sign-off, so they must be in your finishing scope.
  • We provide the engineer's details and drawings your finishing trades need.
  • First-fix cables and pipes are usually best included in the shell so they are in before insulation and boarding.

Why use us in Roehampton?

  • Scaffold access through the roof, so the house stays usable.
  • Structural engineer's calculations on every project.
  • Clear start date and weekly progress updates.
  • Daily tidy-up and floor protection on the route to the loft.

Planning and building control in Roehampton

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Shell-Only Loft Conversions in Roehampton: your questions

Will a loft conversion suit my house in Roehampton?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

How much is a shell-only loft conversion in Roehampton?

Our guide price in Roehampton is £29,500 to £55,500 including VAT. A fixed quote follows a survey of your loft.

Is the survey in Roehampton really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How much does a shell-only loft conversion cost?

Our guide price is £29,500 to £55,500 including VAT depending on the roof type and whether insulation and first fix are included.

Who gets the building regulations certificate?

Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.

Call usGet a quote