Shell-Only Loft Conversions in Greenwich
Homeowners in Greenwich use us for shell-only loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £30,000 to £56,000 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Greenwich
As a district in Greater London, about 5 miles from Central London, Greenwich has a mix of house types, and the right loft design depends on the roof you have.
Victorian and Edwardian terraces with rear outriggers make up much of the housing, which is why L-shaped dormers and mansards are so common here.
What does a shell-only loft conversion cost in Greenwich?
In Greenwich a shell-only loft conversion usually falls between £30,000 and £56,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Greenwich | £30,000 to £56,000 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Shell stage is agreed in writing so both sides know exactly where our work stops.
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
- A shell conversion typically costs around half to two-thirds of a fully finished one.
- The stair is fitted as part of the shell so trades have safe access.
Why use us in Greenwich?
- Written, itemised quote after a free survey.
- Structural engineer's calculations on every project.
- Clear start date and weekly progress updates.
- Daily tidy-up and floor protection on the route to the loft.
Planning and building control in Greenwich
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Shell-Only Loft Conversions in Greenwich: your questions
Who deals with building control in Greenwich?
We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.
Is the survey in Greenwich really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How much is a shell-only loft conversion in Greenwich?
Our guide price in Greenwich is £30,000 to £56,000 including VAT. A fixed quote follows a survey of your loft.
How much does a shell-only loft conversion cost?
Our guide price is £30,000 to £56,000 including VAT depending on the roof type and whether insulation and first fix are included.
How long does it take?
Allow 3 to 6 weeks on site to shell stage.