Shell-Only Loft Conversions in Dorset
We carry out shell-only loft conversions for homeowners in Dorset and across Dorset. A typical project here costs £24,500 to £46,500 including VAT and takes 3 to 6 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Dorset
We carry out shell-only loft conversions throughout Dorset, including Bournemouth, Poole, Weymouth, Christchurch. Prices here follow our guide rate for the South West, about 3% above the national guide.
Bungalows near the coast are frequently converted to add bedrooms with a view.
The mix runs from stone terraces to post-war bungalows, and many towns have conservation areas where roof changes are controlled.
Natural slate roofs are common, so matching slate for dormer cheeks and roof repairs is part of most quotes.
What does a shell-only loft conversion cost in Dorset?
In Dorset a shell-only loft conversion usually falls between £24,500 and £46,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Dorset | £24,500 to £46,500 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- A shell conversion typically costs around half to two-thirds of a fully finished one.
- We provide the engineer's details and drawings your finishing trades need.
- Building control still needs to inspect the later stages and issue the completion certificate after your finish.
- Shell stage is agreed in writing so both sides know exactly where our work stops.
- First-fix cables and pipes are usually best included in the shell so they are in before insulation and boarding.
- The stair is fitted as part of the shell so trades have safe access.
Why use us in Dorset?
- Building regulations inspections booked and attended by us.
- Snagging visit after completion.
- Stage payments tied to completed work, not dates.
- Scaffold access through the roof, so the house stays usable.
- Daily tidy-up and floor protection on the route to the loft.
Planning and building control in Dorset
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Shell-Only Loft Conversions in Dorset: your questions
Will a loft conversion suit my house in Dorset?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How long will the work take?
A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How much does a shell-only loft conversion cost?
Our guide price is £24,500 to £46,500 including VAT depending on the roof type and whether insulation and first fix are included.
What is included at shell stage?
The structure, weatherproof envelope, windows and stairs as standard. Insulation and first-fix services are optional extras we recommend.