Loft Conversion Company

Shell-Only Loft Conversions in Cambridge

We carry out shell-only loft conversions for homeowners in Cambridge and across Cambridgeshire. A typical project here costs £26,000 to £48,500 including VAT and takes 3 to 6 weeks on site.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Shell-Only Loft Conversions in Cambridge

Shell-Only Loft Conversions for homes in Cambridge

Our team covering Cambridgeshire works in Cambridge and nearby St Ives, Ely, Huntingdon. Travel is included in every quote, so there are no call-out charges for the survey.

Bungalows are common across the region and make up a large share of loft conversion enquiries.

What does a shell-only loft conversion cost in Cambridge?

Our guide price in the East of England for a shell-only loft conversion is £26,000 to £48,500 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in Cambridge£26,000 to £48,500 inc. VAT
Typical duration3 to 6 weeks on site
Survey and quoteFree

Key facts

  • Fire doors, smoke alarms and the protected stair are part of final sign-off, so they must be in your finishing scope.
  • A shell conversion typically costs around half to two-thirds of a fully finished one.
  • Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
  • We provide the engineer's details and drawings your finishing trades need.

Why use us in Cambridge?

  • Clear start date and weekly progress updates.
  • Building regulations inspections booked and attended by us.
  • Written, itemised quote after a free survey.
  • One contract for design, approvals and building, with a named project manager.

Planning and building control in Cambridge

Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  4. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

Shell-Only Loft Conversions in Cambridge: your questions

Is the survey in Cambridge really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

Will a loft conversion suit my house in Cambridge?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

Who gets the building regulations certificate?

Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.

Is shell-only cheaper overall?

It can be if you do the finishing yourself. If you pay other trades at normal rates the saving is often small.

Call usGet a quote