We carry out shell-only loft conversions for homeowners in Sandhurst and across Berkshire. A typical project here costs £27,500 to £51,500 including VAT and takes 3 to 6 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Sandhurst
As a town in Berkshire, about 10 miles from Woking, Sandhurst has a mix of house types, and the right loft design depends on the roof you have.
Commuter towns have a lot of 1930s to 1960s housing with good roof pitches for conversion.
What does a shell-only loft conversion cost in Sandhurst?
The guide range for Sandhurst is £27,500 to £51,500 including VAT. Regional labour rates in the South East are about 12% above the national figure we use on the prices page.
| Guide price in Sandhurst | £27,500 to £51,500 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Building control still needs to inspect the later stages and issue the completion certificate after your finish.
- A shell conversion typically costs around half to two-thirds of a fully finished one.
- First-fix cables and pipes are usually best included in the shell so they are in before insulation and boarding.
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
Why use us in Sandhurst?
- Daily tidy-up and floor protection on the route to the loft.
- Structural engineer's calculations on every project.
- Scaffold access through the roof, so the house stays usable.
- Written, itemised quote after a free survey.
Planning and building control in Sandhurst
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Shell-Only Loft Conversions in Sandhurst: your questions
How long will the work take?
A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.
How soon can you start in Sandhurst?
Design and approvals usually take six to ten weeks. Building work in Berkshire is then scheduled for the next available start date, which we confirm in writing.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How long does it take?
Allow 3 to 6 weeks on site to shell stage.
Who gets the building regulations certificate?
Building control issues the completion certificate once the finished conversion has passed its final inspection, so the finishing work must meet the approved plans.