Shell-Only Loft Conversions in Maidenhead
Shell-Only Loft Conversions in Maidenhead are designed and built by one team, from the first survey to the completion certificate. Guide price in Maidenhead: £26,500 to £50,000 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Shell-Only Loft Conversions for homes in Maidenhead
Maidenhead is a large town in Berkshire, about 5 miles from Slough. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a shell-only loft conversion cost in Maidenhead?
Our guide price in the South East for a shell-only loft conversion is £26,500 to £50,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Maidenhead | £26,500 to £50,000 inc. VAT |
|---|---|
| Typical duration | 3 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Fire doors, smoke alarms and the protected stair are part of final sign-off, so they must be in your finishing scope.
- Lenders and insurers may want to see the completion certificate, so plan to finish within a reasonable period.
- The stair is fitted as part of the shell so trades have safe access.
- Shell stage is agreed in writing so both sides know exactly where our work stops.
Why use us in Maidenhead?
- Daily tidy-up and floor protection on the route to the loft.
- Snagging visit after completion.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- One contract for design, approvals and building, with a named project manager.
Planning and building control in Maidenhead
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Shell-Only Loft Conversions in Maidenhead: your questions
Do I need planning permission in Maidenhead?
Planning and building regulations apply in the same way; the completion certificate is issued when the finished work is inspected. We confirm the position with the local planning authority before work starts.
Will a loft conversion suit my house in Maidenhead?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How long will the work take?
A shell-only loft conversion typically takes 3 to 6 weeks on site. Weather and any changes you make to the design can alter that.
What is included at shell stage?
The structure, weatherproof envelope, windows and stairs as standard. Insulation and first-fix services are optional extras we recommend.
How long does it take?
Allow 3 to 6 weeks on site to shell stage.