Rooflight Loft Conversions in Harlesden
Homeowners in Harlesden use us for rooflight loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £31,500 to £48,000 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Rooflight Loft Conversions for homes in Harlesden
Our team covering Greater London works in Harlesden and nearby Willesden, Cricklewood, Wembley. Travel is included in every quote, so there are no call-out charges for the survey.
Many streets fall inside conservation areas or have Article 4 directions, so we check the borough's rules before sketching a dormer.
What does a rooflight loft conversion cost in Harlesden?
Budget £31,500 to £48,000 including VAT for a rooflight loft conversion in Harlesden. Design fees, building control fees and party wall costs are itemised separately so you can see the whole cost.
| Guide price in Harlesden | £31,500 to £48,000 inc. VAT |
|---|---|
| Typical duration | 4 to 6 weeks on site |
| Survey and quote | Free |
Key facts
- Roof windows on a front slope are allowed under permitted development if they project no more than 150mm from the roof plane.
- Roof windows can be centre-pivot, top-hung for a clear view, or conservation style with a glazing bar.
- Head height is the deciding factor: about 2.2 metres under the ridge before work starts is the usual minimum.
- Because the roof shape does not change, a rooflight conversion rarely needs planning permission on a house.
Why use us in Harlesden?
- Structural engineer's calculations on every project.
- Clear start date and weekly progress updates.
- Scaffold access through the roof, so the house stays usable.
- One contract for design, approvals and building, with a named project manager.
Planning and building control in Harlesden
Rooflight conversions on houses are normally permitted development; conservation areas and flats are the main exceptions.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
How the work runs
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Rooflight Loft Conversions in Harlesden: your questions
How soon can you start in Harlesden?
Design and approvals usually take six to ten weeks. Building work in Greater London is then scheduled for the next available start date, which we confirm in writing.
Is the survey in Harlesden really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
Will a loft conversion suit my house in Harlesden?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How much does a rooflight loft conversion cost?
Our guide price is £31,500 to £48,000 including VAT, depending on floor area, the number of roof windows and whether a shower room is added.
How do I know if my loft is high enough?
Measure from the top of the ceiling joists to the underside of the ridge timber. Around 2.2 metres or more usually works. Below that, a dormer or mansard is needed to gain height.