We carry out mansard loft conversions for homeowners in Coventry and across the West Midlands. A typical project here costs £59,500 to £94,000 including VAT and takes 10 to 14 weeks on site.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Mansard Loft Conversions in Coventry

Mansard Loft Conversions for homes in Coventry

Coventry is a major city in the West Midlands. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Inter-war semis with hipped roofs are everywhere, which makes hip to gable with a rear dormer the standard job.

What does a mansard loft conversion cost in Coventry?

Prices in Coventry follow our guide rate for the West Midlands, which is in line with the national guide. That puts a mansard loft conversion at £59,500 to £94,000 including VAT. Your fixed quote follows the survey and sets out each stage payment.

Guide price in Coventry£59,500 to £94,000 inc. VAT
Typical duration10 to 14 weeks on site
Survey and quoteFree

Key facts

  • Because the whole roof comes off, a temporary tin-hat scaffold roof is normally used to keep the house dry.
  • Butterfly (London) roofs are commonly converted with a mansard because they have no usable loft void.
  • A double mansard converts the front slope as well as the rear and is treated as a full extra storey.
  • Many London boroughs publish design guidance that favours mansards over box dormers on Victorian terraces.

Why use us in Coventry?

  • Scaffold access through the roof, so the house stays usable.
  • Written, itemised quote after a free survey.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.
  • Daily tidy-up and floor protection on the route to the loft.

Planning and building control in Coventry

Mansard conversions normally need a householder planning application; we prepare the drawings and manage the application.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Mansard Loft Conversions in Coventry: your questions

Is the survey in Coventry really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

Will a loft conversion suit my house in Coventry?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

Why choose a mansard over a dormer?

A mansard gives more floor area and head height and is often the only design a council will approve on a period terrace or in a conservation area. A dormer is cheaper and quicker where it is allowed.

How long does a mansard take to build?

Allow 10 to 14 weeks on site after planning approval and party wall agreements are in place.