Loft Conversion Company

Mansard Loft Conversions in Heston

Mansard Loft Conversions in Heston are designed and built by one team, from the first survey to the completion certificate. Guide price in Heston: £74,500 to £118,000 including VAT.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Mansard Loft Conversions in Heston

Mansard Loft Conversions for homes in Heston

Heston, 10 miles from Slough, is within the part of Greater London we cover. We also work in Hounslow, Isleworth, Southall.

Many streets fall inside conservation areas or have Article 4 directions, so we check the borough's rules before sketching a dormer.

What does a mansard loft conversion cost in Heston?

Our guide price in London for a mansard loft conversion is £74,500 to £118,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.

Guide price in Heston£74,500 to £118,000 inc. VAT
Typical duration10 to 14 weeks on site
Survey and quoteFree

Key facts

  • A mansard almost always needs planning permission because it changes the shape and height of the roof.
  • Because the whole roof comes off, a temporary tin-hat scaffold roof is normally used to keep the house dry.
  • A double mansard converts the front slope as well as the rear and is treated as a full extra storey.
  • Party walls are raised in brick on both sides, so party wall agreements with both neighbours are part of the job.

Why use us in Heston?

  • Written, itemised quote after a free survey.
  • Daily tidy-up and floor protection on the route to the loft.
  • Building regulations inspections booked and attended by us.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.

Planning and building control in Heston

Mansard conversions normally need a householder planning application; we prepare the drawings and manage the application.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Mansard Loft Conversions in Heston: your questions

Will a loft conversion suit my house in Heston?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

Is the survey in Heston really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How long will the work take?

A mansard loft conversion typically takes 10 to 14 weeks on site. Weather and any changes you make to the design can alter that.

Why choose a mansard over a dormer?

A mansard gives more floor area and head height and is often the only design a council will approve on a period terrace or in a conservation area. A dormer is cheaper and quicker where it is allowed.

Does a mansard need planning permission?

Yes in almost every case. A decision normally takes around eight weeks from validation, and we advise at survey on what your council has approved on nearby houses.

Call usGet a quote