Loft Conversion Company

Loft Bedroom with En-Suite in Northamptonshire

We carry out loft bedrooms with en-suite for homeowners in Northamptonshire and across Northamptonshire. A typical project here costs £47,000 to £73,500 including VAT and takes 8 to 11 weeks on site.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Loft Bedroom with En-Suite in Northamptonshire

Loft Bedroom with En-Suite for homes in Northamptonshire

We carry out loft bedrooms with en-suite throughout Northamptonshire, including Northampton, Corby, Kettering, Wellingborough. Prices here follow our guide rate for the East Midlands, about 2% below the national guide.

Clay pantile and plain tile roofs are typical, so new dormers are usually tile-hung to match.

Red-brick terraces and inter-war semis dominate the older suburbs, with trussed roofs on the estates built since the 1970s.

Bungalows are common in the towns and villages and often have generous roof space.

What does a loft bedroom with en-suite cost in Northamptonshire?

Prices in Northamptonshire follow our guide rate for the East Midlands, which is about 2% below the national guide. That puts a loft bedroom with en-suite at £47,000 to £73,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.

Guide price in Northamptonshire£47,000 to £73,500 inc. VAT
Typical duration8 to 11 weeks on site
Survey and quoteFree

Key facts

  • Electric underfloor heating is a common upgrade in a tiled loft en-suite.
  • Fitted eaves storage uses the low space behind dwarf walls that would otherwise be lost.
  • The shower is placed where head height is greatest, usually against the dormer wall.
  • Waste pipes need a fall to the soil stack, which fixes where the en-suite can go.
  • Mains-pressure hot water gives a better shower in the loft than a gravity system with a tank at the same level.
  • A roof window over a bath or basin gives daylight without overlooking.

Why use us in Northamptonshire?

  • One contract for design, approvals and building, with a named project manager.
  • Building regulations inspections booked and attended by us.
  • Stage payments tied to completed work, not dates.
  • Clear start date and weekly progress updates.
  • Daily tidy-up and floor protection on the route to the loft.

Planning and building control in Northamptonshire

Adding an en-suite does not change the planning position; it is covered by building regulations for drainage, ventilation and electrics.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  5. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

Loft Bedroom with En-Suite in Northamptonshire: your questions

How soon can you start in Northamptonshire?

Design and approvals usually take six to ten weeks. Building work in Northamptonshire is then scheduled for the next available start date, which we confirm in writing.

Who deals with building control in Northamptonshire?

We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.

Is the survey in Northamptonshire really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How big does the loft need to be for an en-suite?

A shower room needs about 1.2 by 2.2 metres of floor with standing height over the shower and in front of the basin and WC.

How long does it take?

Allow 8 to 11 weeks on site.

Towns we cover in Northamptonshire

Request a free survey and quote

Or call 0800 088 6341. Mon–Fri 8am–6pm, Sat 9am–1pm.

Call usGet a quote