Loft Bedroom with En-Suite in March
Planning a loft bedroom with en-suite in March? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £51,000 to £80,000 including VAT for Cambridgeshire.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Loft Bedroom with En-Suite for homes in March
Our team covering Cambridgeshire works in March and nearby Primrose Place, Wisbech, Ely. Travel is included in every quote, so there are no call-out charges for the survey.
Flat landscapes and wide plots mean side and rear dormers are usually easy to scaffold.
What does a loft bedroom with en-suite cost in March?
Budget £51,000 to £80,000 including VAT for a loft bedroom with en-suite in March. Design fees, building control fees and party wall costs are itemised separately so you can see the whole cost.
| Guide price in March | £51,000 to £80,000 inc. VAT |
|---|---|
| Typical duration | 8 to 11 weeks on site |
| Survey and quote | Free |
Key facts
- A macerator can be used where gravity drainage is not possible, though a direct connection is better.
- Mains-pressure hot water gives a better shower in the loft than a gravity system with a tank at the same level.
- Waste pipes need a fall to the soil stack, which fixes where the en-suite can go.
- An extractor fan ducted to outside is required in the en-suite under ventilation rules.
Why use us in March?
- Building regulations inspections booked and attended by us.
- Written, itemised quote after a free survey.
- Stage payments tied to completed work, not dates.
- Daily tidy-up and floor protection on the route to the loft.
Planning and building control in March
Adding an en-suite does not change the planning position; it is covered by building regulations for drainage, ventilation and electrics.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Loft Bedroom with En-Suite in March: your questions
How much is a loft bedroom with en-suite in March?
Our guide price in March is £51,000 to £80,000 including VAT. A fixed quote follows a survey of your loft.
How long will the work take?
A loft bedroom with en-suite typically takes 8 to 11 weeks on site. Weather and any changes you make to the design can alter that.
Is the survey in March really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How long does it take?
Allow 8 to 11 weeks on site.
Can I have a bath instead of a shower?
Yes, if the floor is designed for the load and there is height to stand at one end. Baths are often placed under the slope.