Hip to Gable Loft Conversions in West Molesey
We carry out hip to gable loft conversions for homeowners in West Molesey and across Surrey. A typical project here costs £56,500 to £85,000 including VAT and takes 8 to 12 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Hip to Gable Loft Conversions for homes in West Molesey
West Molesey, 10 miles from Woking, is within the part of Surrey we cover. We also work in East Molesey, Sunbury-on-Thames, Walton-on-Thames.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a hip to gable loft conversion cost in West Molesey?
In West Molesey a hip to gable loft conversion usually falls between £56,500 and £85,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in West Molesey | £56,500 to £85,000 inc. VAT |
|---|---|
| Typical duration | 8 to 12 weeks on site |
| Survey and quote | Free |
Key facts
- A hip to gable with a rear dormer is the largest conversion most 1930s semis can have under permitted development.
- The volume of the new gable counts towards the 40 or 50 cubic metre permitted development allowance in England.
- The new gable is built in brickwork, blockwork and render, or timber frame with tile hanging, to match the house.
- Where the neighbour's half of a semi keeps its hip, the roofline changes, which some councils restrict in conservation areas.
Why use us in West Molesey?
- Stage payments tied to completed work, not dates.
- Daily tidy-up and floor protection on the route to the loft.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- Building regulations inspections booked and attended by us.
Planning and building control in West Molesey
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Hip to Gable Loft Conversions in West Molesey: your questions
How much is a hip to gable loft conversion in West Molesey?
Our guide price in West Molesey is £56,500 to £85,000 including VAT. A fixed quote follows a survey of your loft.
Who deals with building control in West Molesey?
We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.
Do I need planning permission in West Molesey?
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land. We confirm the position with the local planning authority before work starts.
Will it look odd next to my neighbour's hipped roof?
The roofline does become asymmetrical on a pair of semis. Using matching tiles and brick keeps it tidy, and it is now a very common sight on 1930s streets.
How long does it take?
Allow 8 to 12 weeks on site. The roof is opened and made weathertight in the first two to three weeks, so the house is exposed for as short a time as possible.