Hip to Gable Loft Conversions in Ashford
Planning a hip to gable loft conversion in Ashford? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £58,500 to £88,000 including VAT for Surrey.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Hip to Gable Loft Conversions for homes in Ashford
Our team covering Surrey works in Ashford and nearby Staines, Sunbury-on-Thames, Walton-on-Thames. Travel is included in every quote, so there are no call-out charges for the survey.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a hip to gable loft conversion cost in Ashford?
The guide range for Ashford is £58,500 to £88,000 including VAT. Regional labour rates in the South East are about 12% above the national figure we use on the prices page.
| Guide price in Ashford | £58,500 to £88,000 inc. VAT |
|---|---|
| Typical duration | 8 to 12 weeks on site |
| Survey and quote | Free |
Key facts
- Where the neighbour's half of a semi keeps its hip, the roofline changes, which some councils restrict in conservation areas.
- On a detached house both hips can be converted, which is called a double hip to gable.
- The volume of the new gable counts towards the 40 or 50 cubic metre permitted development allowance in England.
- A hip to gable with a rear dormer is the largest conversion most 1930s semis can have under permitted development.
Why use us in Ashford?
- Scaffold access through the roof, so the house stays usable.
- Snagging visit after completion.
- Clear start date and weekly progress updates.
- Structural engineer's calculations on every project.
Planning and building control in Ashford
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
How the work runs
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Hip to Gable Loft Conversions in Ashford: your questions
Do you cover Ashford?
Yes. We carry out hip to gable loft conversions in Ashford and throughout Surrey. Surveys are free and without obligation.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
Is the survey in Ashford really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
How long does it take?
Allow 8 to 12 weeks on site. The roof is opened and made weathertight in the first two to three weeks, so the house is exposed for as short a time as possible.
Is my house suitable for a hip to gable conversion?
If the side of your roof slopes down towards the side wall, as on most 1930s semis, bungalows and many detached houses, it is a hipped roof and can usually be converted. Mid-terraced houses have no hip, so a dormer is used instead.