Hip to Gable Loft Conversions in Frome
Planning a hip to gable loft conversion in Frome? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £54,000 to £81,000 including VAT for Somerset.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Hip to Gable Loft Conversions for homes in Frome
We cover Frome and the surrounding parts of Somerset, about 10 miles from Bath. Surveys are by appointment, including early evenings.
The mix runs from stone terraces to post-war bungalows, and many towns have conservation areas where roof changes are controlled.
What does a hip to gable loft conversion cost in Frome?
Prices in Frome follow our guide rate for the South West, which is about 3% above the national guide. That puts a hip to gable loft conversion at £54,000 to £81,000 including VAT. Your fixed quote follows the survey and sets out each stage payment.
| Guide price in Frome | £54,000 to £81,000 inc. VAT |
|---|---|
| Typical duration | 8 to 12 weeks on site |
| Survey and quote | Free |
Key facts
- A gable window lights the stair and landing; if it faces the side it is normally obscure-glazed.
- Matching the original roof tiles matters, so we source reclaimed or like-for-like tiles for the extended ridge.
- A hip to gable with a rear dormer is the largest conversion most 1930s semis can have under permitted development.
- The volume of the new gable counts towards the 40 or 50 cubic metre permitted development allowance in England.
Why use us in Frome?
- Daily tidy-up and floor protection on the route to the loft.
- Structural engineer's calculations on every project.
- Snagging visit after completion.
- Written, itemised quote after a free survey.
Planning and building control in Frome
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Hip to Gable Loft Conversions in Frome: your questions
How long will the work take?
A hip to gable loft conversion typically takes 8 to 12 weeks on site. Weather and any changes you make to the design can alter that.
How soon can you start in Frome?
Design and approvals usually take six to ten weeks. Building work in Somerset is then scheduled for the next available start date, which we confirm in writing.
Who deals with building control in Frome?
We do. We make the application, book each inspection with building control and hand you the completion certificate at the end.
Is my house suitable for a hip to gable conversion?
If the side of your roof slopes down towards the side wall, as on most 1930s semis, bungalows and many detached houses, it is a hipped roof and can usually be converted. Mid-terraced houses have no hip, so a dormer is used instead.
How much does a hip to gable loft conversion cost?
Our guide price is £54,000 to £81,000 including VAT for a hip to gable with a rear dormer. Building the gable in facing brick and adding a bathroom sit at the upper end.