Hip to Gable Loft Conversions in Shrewsbury
Homeowners in Shrewsbury use us for hip to gable loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £51,000 to £76,500 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Hip to Gable Loft Conversions for homes in Shrewsbury
Shrewsbury is a large town in Shropshire, about 13 miles from Telford. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
Post-war and 1970s estates bring plenty of trussed roofs that need an engineer-led design.
What does a hip to gable loft conversion cost in Shrewsbury?
Prices in Shrewsbury follow our guide rate for the West Midlands, which is in line with the national guide. That puts a hip to gable loft conversion at £51,000 to £76,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.
| Guide price in Shrewsbury | £51,000 to £76,500 inc. VAT |
|---|---|
| Typical duration | 8 to 12 weeks on site |
| Survey and quote | Free |
Key facts
- On a detached house both hips can be converted, which is called a double hip to gable.
- Where the neighbour's half of a semi keeps its hip, the roofline changes, which some councils restrict in conservation areas.
- Matching the original roof tiles matters, so we source reclaimed or like-for-like tiles for the extended ridge.
- The new gable is built in brickwork, blockwork and render, or timber frame with tile hanging, to match the house.
Why use us in Shrewsbury?
- Structural engineer's calculations on every project.
- Building regulations inspections booked and attended by us.
- Written, itemised quote after a free survey.
- Clear start date and weekly progress updates.
Planning and building control in Shrewsbury
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Hip to Gable Loft Conversions in Shrewsbury: your questions
Do I need planning permission in Shrewsbury?
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land. We confirm the position with the local planning authority before work starts.
How much is a hip to gable loft conversion in Shrewsbury?
Our guide price in Shrewsbury is £51,000 to £76,500 including VAT. A fixed quote follows a survey of your loft.
How soon can you start in Shrewsbury?
Design and approvals usually take six to ten weeks. Building work in Shropshire is then scheduled for the next available start date, which we confirm in writing.
Do I need planning permission?
Usually not on a house in England, because hip to gable enlargements fall within permitted development when the volume limit and other conditions are met. We check this at survey and can apply for a lawful development certificate so you have it in writing.
How long does it take?
Allow 8 to 12 weeks on site. The roof is opened and made weathertight in the first two to three weeks, so the house is exposed for as short a time as possible.