Hip to Gable Loft Conversions in Holloway
Homeowners in Holloway use us for hip to gable loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £64,500 to £96,500 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Hip to Gable Loft Conversions for homes in Holloway
Holloway is a district in Greater London, about 3 miles from Central London. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
Inter-war semis in the outer boroughs are classic hip to gable candidates.
What does a hip to gable loft conversion cost in Holloway?
Prices in Holloway follow our guide rate for London, which is about 25% above the national guide. That puts a hip to gable loft conversion at £64,500 to £96,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.
| Guide price in Holloway | £64,500 to £96,500 inc. VAT |
|---|---|
| Typical duration | 8 to 12 weeks on site |
| Survey and quote | Free |
Key facts
- A gable window lights the stair and landing; if it faces the side it is normally obscure-glazed.
- A hip to gable with a rear dormer is the largest conversion most 1930s semis can have under permitted development.
- The gable end is the usual place for the new staircase to land, directly above the existing stairs.
- The new gable is built in brickwork, blockwork and render, or timber frame with tile hanging, to match the house.
Why use us in Holloway?
- Building regulations inspections booked and attended by us.
- One contract for design, approvals and building, with a named project manager.
- Structural engineer's calculations on every project.
- Clear start date and weekly progress updates.
Planning and building control in Holloway
A hip to gable conversion is normally permitted development on a house in England, provided the total added volume stays within the limit and the house is not on designated land.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Hip to Gable Loft Conversions in Holloway: your questions
Will a loft conversion suit my house in Holloway?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How soon can you start in Holloway?
Design and approvals usually take six to ten weeks. Building work in Greater London is then scheduled for the next available start date, which we confirm in writing.
How long will the work take?
A hip to gable loft conversion typically takes 8 to 12 weeks on site. Weather and any changes you make to the design can alter that.
Is my house suitable for a hip to gable conversion?
If the side of your roof slopes down towards the side wall, as on most 1930s semis, bungalows and many detached houses, it is a hipped roof and can usually be converted. Mid-terraced houses have no hip, so a dormer is used instead.
How long does it take?
Allow 8 to 12 weeks on site. The roof is opened and made weathertight in the first two to three weeks, so the house is exposed for as short a time as possible.