Loft Conversion Company

Party wall agreements for loft conversions

In England and Wales, a loft conversion on a terraced or semi-detached house usually needs a party wall notice, because steel beams are inserted into the shared wall. The notice must be served on the adjoining owner at least two months before the work starts. The neighbour can consent in writing, or dissent, in which case one or two surveyors prepare a party wall award.

Which loft work is covered?

Cutting into a party wall to seat a beam, raising a party wall for a mansard or dormer, and removing a chimney breast attached to a party wall are all covered by the Party Wall etc. Act 1996.

What does the notice say?

It gives your name and address, describes the work, includes drawings where relevant and states the intended start date. We prepare notices and drawings as part of the design stage.

What if the neighbour does not reply?

If there is no written consent within 14 days, a dispute is deemed to have arisen and surveyors are appointed. An agreed surveyor acting for both owners keeps costs down.

Who pays?

The owner doing the work normally pays the reasonable surveyors' fees for both sides. Fees vary by area and by how many neighbours are involved.

Scotland and Northern Ireland

The Act does not apply. Shared walls are governed by title deeds and common law, so the practical advice is the same: talk to neighbours early and record the condition of their property before starting.

Last reviewed November 2026. This guide is general information; rules vary by nation and council, and we confirm the position for your address at survey.

Add us as a preferred source on Google

Related guides

Ready to find out what your loft can become?

Book a free home survey or get an instant guide price online.

Call usGet a quote