Dormer Loft Conversions in Salisbury
We carry out dormer loft conversions for homeowners in Salisbury and across Wiltshire. A typical project here costs £43,000 to £66,500 including VAT and takes 6 to 10 weeks on site.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Salisbury
Salisbury is a mid-sized town in Wiltshire, about 21 miles from Southampton. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
Natural slate roofs are common, so matching slate for dormer cheeks and roof repairs is part of most quotes.
What does a dormer loft conversion cost in Salisbury?
Our guide price in the South West for a dormer loft conversion is £43,000 to £66,500 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in Salisbury | £43,000 to £66,500 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
- Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
- The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
- A Juliet balcony with inward-opening doors is a common addition on the rear face of a dormer.
Why use us in Salisbury?
- Clear start date and weekly progress updates.
- Building regulations inspections booked and attended by us.
- Snagging visit after completion.
- Stage payments tied to completed work, not dates.
Planning and building control in Salisbury
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Dormer Loft Conversions in Salisbury: your questions
Will a loft conversion suit my house in Salisbury?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How long will the work take?
A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.
Do I need planning permission for a dormer?
Often not. In England a rear dormer on a house normally counts as permitted development if the added roof volume stays within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house and the other conditions are met. Flats, conservation areas and front dormers usually need a planning application.
Will I have to move out?
No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.