For a dormer loft conversion in West Sussex, expect a guide price of £47,000 to £73,000 including VAT and around 6 to 10 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in West Sussex

Dormer Loft Conversions for homes in West Sussex

We carry out dormer loft conversions throughout West Sussex, including Crawley, Worthing, Bognor Regis, Littlehampton. Prices here follow our guide rate for the South East, about 12% above the national guide.

Chalet bungalows and dormer bungalows are a familiar sight, so bungalow conversions rarely look out of place.

Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.

Commuter towns have a lot of 1930s to 1960s housing with good roof pitches for conversion.

What does a dormer loft conversion cost in West Sussex?

In West Sussex a dormer loft conversion usually falls between £47,000 and £73,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.

Guide price in West Sussex£47,000 to £73,000 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
  • Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
  • Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.
  • Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
  • A full-width rear dormer typically adds 20 to 30 square metres of usable floor.
  • A Juliet balcony with inward-opening doors is a common addition on the rear face of a dormer.

Why use us in West Sussex?

  • Snagging visit after completion.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.
  • Daily tidy-up and floor protection on the route to the loft.
  • Structural engineer's calculations on every project.
  • Building regulations inspections booked and attended by us.

Planning and building control in West Sussex

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

How the work runs

  1. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

  4. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

  5. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Dormer Loft Conversions in West Sussex: your questions

How long will the work take?

A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.

Is the survey in West Sussex really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How soon can you start in West Sussex?

Design and approvals usually take six to ten weeks. Building work in West Sussex is then scheduled for the next available start date, which we confirm in writing.

How long does a dormer loft conversion take?

Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.

Can a dormer go on the front of the house?

It can, but a front dormer that faces a road is outside permitted development, so it needs planning permission and is usually a smaller pitched-roof design.

Towns we cover in West Sussex

Request a free survey and quote

Or call 0800 088 6341. Mon–Fri 8am–6pm, Sat 9am–1pm.

Call usGet a quote