Homeowners in Whickham use us for dormer loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £38,500 to £59,500 including VAT.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in Whickham

Dormer Loft Conversions for homes in Whickham

Whickham is a town in Tyne and Wear, about 3 miles from Newcastle upon Tyne. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Semi-detached houses with hipped roofs are the most common conversion we are asked about.

What does a dormer loft conversion cost in Whickham?

Prices in Whickham follow our guide rate for the North East, which is about 8% below the national guide. That puts a dormer loft conversion at £38,500 to £59,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.

Guide price in Whickham£38,500 to £59,500 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
  • Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
  • Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
  • Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.

Why use us in Whickham?

  • Scaffold access through the roof, so the house stays usable.
  • Building regulations inspections booked and attended by us.
  • Snagging visit after completion.
  • Structural engineer's calculations on every project.

Planning and building control in Whickham

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  3. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Dormer Loft Conversions in Whickham: your questions

How soon can you start in Whickham?

Design and approvals usually take six to ten weeks. Building work in Tyne and Wear is then scheduled for the next available start date, which we confirm in writing.

Will a loft conversion suit my house in Whickham?

Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.

Is the survey in Whickham really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

How long does a dormer loft conversion take?

Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.

Will I have to move out?

No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.