Dormer Loft Conversions in Corby
Dormer Loft Conversions in Corby are designed and built by one team, from the first survey to the completion certificate. Guide price in Corby: £40,000 to £62,000 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Corby
Corby, 19 miles from Northampton, is within the part of Northamptonshire we cover. We also work in Kettering, Wellingborough, Rushden.
Red-brick terraces and inter-war semis dominate the older suburbs, with trussed roofs on the estates built since the 1970s.
What does a dormer loft conversion cost in Corby?
In Corby a dormer loft conversion usually falls between £40,000 and £62,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Corby | £40,000 to £62,000 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
- Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
- The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
- A full-width rear dormer typically adds 20 to 30 square metres of usable floor.
Why use us in Corby?
- Snagging visit after completion.
- Structural engineer's calculations on every project.
- One contract for design, approvals and building, with a named project manager.
- Building regulations inspections booked and attended by us.
Planning and building control in Corby
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
How the work runs
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Stairs and first fix
The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Dormer Loft Conversions in Corby: your questions
Do you cover Corby?
Yes. We carry out dormer loft conversions in Corby and throughout Northamptonshire. Surveys are free and without obligation.
Do I need planning permission in Corby?
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.
Will a loft conversion suit my house in Corby?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.
How much does a dormer loft conversion cost?
Our guide price for a rear dormer loft conversion is £40,000 to £62,000 including VAT, depending on the width of the dormer, the finish and whether a bathroom is included. A fixed written quote follows a home survey.
How long does a dormer loft conversion take?
Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.