Dormer Loft Conversions in Fleet
A dormer loft conversion in Fleet typically costs £47,000 to £72,500 including VAT. We start with a free home survey to measure head height and check the roof structure.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Fleet
Fleet, 11 miles from Basingstoke, is within the part of Hampshire we cover. We also work in Farnborough, Aldershot, Yateley.
Inter-war semis and post-war detached houses are common, and most convert with a hip to gable and rear dormer.
What does a dormer loft conversion cost in Fleet?
Prices in Fleet follow our guide rate for the South East, which is about 12% above the national guide. That puts a dormer loft conversion at £47,000 to £72,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.
| Guide price in Fleet | £47,000 to £72,500 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.
- A Juliet balcony with inward-opening doors is a common addition on the rear face of a dormer.
- A full-width rear dormer typically adds 20 to 30 square metres of usable floor.
- Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
Why use us in Fleet?
- Clear start date and weekly progress updates.
- Snagging visit after completion.
- One contract for design, approvals and building, with a named project manager.
- Written, itemised quote after a free survey.
Planning and building control in Fleet
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Neighbour notices
Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Dormer Loft Conversions in Fleet: your questions
How long will the work take?
A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.
Do you cover Fleet?
Yes. We carry out dormer loft conversions in Fleet and throughout Hampshire. Surveys are free and without obligation.
Do I need planning permission in Fleet?
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.
Do I need planning permission for a dormer?
Often not. In England a rear dormer on a house normally counts as permitted development if the added roof volume stays within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house and the other conditions are met. Flats, conservation areas and front dormers usually need a planning application.
How long does a dormer loft conversion take?
Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.