Dormer Loft Conversions in New Malden
Planning a dormer loft conversion in New Malden? We survey the roof, produce the drawings, deal with approvals and build it, with a guide price of £51,500 to £80,000 including VAT for Greater London.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in New Malden
Our team covering Greater London works in New Malden and nearby Worcester Park, Surbiton, Morden. Travel is included in every quote, so there are no call-out charges for the survey.
Victorian and Edwardian terraces with rear outriggers make up much of the housing, which is why L-shaped dormers and mansards are so common here.
What does a dormer loft conversion cost in New Malden?
Our guide price in London for a dormer loft conversion is £51,500 to £80,000 including VAT. The main variables are floor area, the roof covering, steelwork and whether a bathroom is included.
| Guide price in New Malden | £51,500 to £80,000 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- A full-width rear dormer typically adds 20 to 30 square metres of usable floor.
- Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
- Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
- The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
Why use us in New Malden?
- One contract for design, approvals and building, with a named project manager.
- Building regulations inspections booked and attended by us.
- Stage payments tied to completed work, not dates.
- Clear start date and weekly progress updates.
Planning and building control in New Malden
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Design and fixed quote
You receive layout options and a written, itemised price that does not change unless you change the design.
Drawings and engineer's calculations
Our design team produces the plans and the structural engineer specifies beams and joists.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Dormer Loft Conversions in New Malden: your questions
Is the survey in New Malden really free?
Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How long will the work take?
A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.
Do I need planning permission for a dormer?
Often not. In England a rear dormer on a house normally counts as permitted development if the added roof volume stays within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house and the other conditions are met. Flats, conservation areas and front dormers usually need a planning application.
How long does a dormer loft conversion take?
Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.