Loft Conversion Company

Dormer Loft Conversions in Latchmere

For a dormer loft conversion in Latchmere, expect a guide price of £53,000 to £82,000 including VAT and around 6 to 10 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in Latchmere

Dormer Loft Conversions for homes in Latchmere

Latchmere is a district in Greater London, about 3 miles from Central London. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.

Victorian and Edwardian terraces with rear outriggers make up much of the housing, which is why L-shaped dormers and mansards are so common here.

What does a dormer loft conversion cost in Latchmere?

Budget £53,000 to £82,000 including VAT for a dormer loft conversion in Latchmere. Design fees, building control fees and party wall costs are itemised separately so you can see the whole cost.

Guide price in Latchmere£53,000 to £82,000 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
  • The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
  • Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
  • Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.

Why use us in Latchmere?

  • Scaffold access through the roof, so the house stays usable.
  • One contract for design, approvals and building, with a named project manager.
  • Building regulations inspections booked and attended by us.
  • Written, itemised quote after a free survey.

Planning and building control in Latchmere

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

Where beams bear on a shared wall, the Party Wall etc. Act 1996 requires written notice to the adjoining owner at least two months before work starts.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

How the work runs

  1. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  2. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  3. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  4. Scaffold and structure

    Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.

Dormer Loft Conversions in Latchmere: your questions

Do you cover Latchmere?

Yes. We carry out dormer loft conversions in Latchmere and throughout Greater London. Surveys are free and without obligation.

Is the survey in Latchmere really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

How long does a dormer loft conversion take?

Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.

Do I need planning permission for a dormer?

Often not. In England a rear dormer on a house normally counts as permitted development if the added roof volume stays within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house and the other conditions are met. Flats, conservation areas and front dormers usually need a planning application.

Call usGet a quote