Dormer Loft Conversions in Chiswick
Homeowners in Chiswick use us for dormer loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £52,500 to £81,500 including VAT.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Dormer Loft Conversions for homes in Chiswick
Chiswick, 6 miles from Central London, is within the part of Greater London we cover. We also work in Acton, Barnes, Shepherds Bush.
Victorian and Edwardian terraces with rear outriggers make up much of the housing, which is why L-shaped dormers and mansards are so common here.
What does a dormer loft conversion cost in Chiswick?
In Chiswick a dormer loft conversion usually falls between £52,500 and £81,500 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.
| Guide price in Chiswick | £52,500 to £81,500 inc. VAT |
|---|---|
| Typical duration | 6 to 10 weeks on site |
| Survey and quote | Free |
Key facts
- Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
- Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
- Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
- Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
Why use us in Chiswick?
- One contract for design, approvals and building, with a named project manager.
- Building regulations inspections booked and attended by us.
- Matching tiles, slate and brick sourced for a roofline that fits the street.
- Stage payments tied to completed work, not dates.
Planning and building control in Chiswick
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.
Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.
In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.
How the work runs
Free home survey
A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.
Approvals
We submit planning or lawful development applications where needed and deal with building control.
Scaffold and structure
Scaffolding goes up, steel and new floor joists go in, and the roof is opened and made weathertight.
Finish and certificate
Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.
Dormer Loft Conversions in Chiswick: your questions
How long will the work take?
A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.
Do I need planning permission in Chiswick?
Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.
Can I stay in the house during the work?
Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.
How much does a dormer loft conversion cost?
Our guide price for a rear dormer loft conversion is £52,500 to £81,500 including VAT, depending on the width of the dormer, the finish and whether a bathroom is included. A fixed written quote follows a home survey.
Will I have to move out?
No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.