Loft Conversion Company

Dormer Loft Conversions in Exeter

Homeowners in Exeter use us for dormer loft conversions because the survey, drawings, structural design, approvals and build sit under one contract. Guide price: £42,500 to £65,500 including VAT.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in Exeter

Dormer Loft Conversions for homes in Exeter

Our team covering Devon works in Exeter and nearby Heavitree, Exmouth, Tiverton. Travel is included in every quote, so there are no call-out charges for the survey.

Bungalows near the coast are frequently converted to add bedrooms with a view.

What does a dormer loft conversion cost in Exeter?

Prices in Exeter follow our guide rate for the South West, which is about 3% above the national guide. That puts a dormer loft conversion at £42,500 to £65,500 including VAT. Your fixed quote follows the survey and sets out each stage payment.

Guide price in Exeter£42,500 to £65,500 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • Most rear dormers are built from scaffolding, so the house stays lived-in until the stair opening is cut.
  • Under permitted development in England a dormer has to sit at least 20cm back from the original eaves.
  • The flat roof of the dormer is normally a single-ply membrane or GRP with a fall to a rear gutter.
  • Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.

Why use us in Exeter?

  • Scaffold access through the roof, so the house stays usable.
  • Structural engineer's calculations on every project.
  • Daily tidy-up and floor protection on the route to the loft.
  • Written, itemised quote after a free survey.

Planning and building control in Exeter

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Approvals

    We submit planning or lawful development applications where needed and deal with building control.

  2. Neighbour notices

    Where shared walls are involved we prepare the notices and a record of the neighbour's property before work starts.

  3. Stairs and first fix

    The staircase is fitted, then wiring, plumbing and insulation go in and are inspected.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Dormer Loft Conversions in Exeter: your questions

Is the survey in Exeter really free?

Yes. The survey and quote are free. Drawings and calculations are charged only once you decide to go ahead.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

How long will the work take?

A dormer loft conversion typically takes 6 to 10 weeks on site. Weather and any changes you make to the design can alter that.

How long does a dormer loft conversion take?

Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.

Will I have to move out?

No. Most of the work is done from scaffolding through the roof. The messiest stage inside the house is when the new staircase goes in, which usually takes a few days.

Call usGet a quote