Loft Conversion Company

Dormer Loft Conversions in Windsor

For a dormer loft conversion in Windsor, expect a guide price of £48,000 to £74,000 including VAT and around 6 to 10 weeks on site. One company handles design, approvals and construction.

  • Free home survey
  • Fixed written quote
  • Drawings and engineer included
  • Building control handled
  • UK-wide teams

Get a guide priceBook a free survey

Dormer Loft Conversions in Windsor

Dormer Loft Conversions for homes in Windsor

Windsor, 2 miles from Slough, is within the part of Berkshire we cover. We also work in Slough, Maidenhead, Ascot.

Commuter towns have a lot of 1930s to 1960s housing with good roof pitches for conversion.

What does a dormer loft conversion cost in Windsor?

In Windsor a dormer loft conversion usually falls between £48,000 and £74,000 including VAT. Use the quote tool for a figure based on your house type and specification, then book a survey for a fixed price.

Guide price in Windsor£48,000 to £74,000 inc. VAT
Typical duration6 to 10 weeks on site
Survey and quoteFree

Key facts

  • Steel beams normally span between the party or gable walls and carry the new floor and the dormer.
  • A full-width rear dormer typically adds 20 to 30 square metres of usable floor.
  • Pitched-roof 'dog house' dormers are an option at the front where a planning authority asks for them.
  • Dormer cheeks and face are usually finished in hanging tile, slate or a standing-seam metal look to suit the roof.

Why use us in Windsor?

  • Daily tidy-up and floor protection on the route to the loft.
  • One contract for design, approvals and building, with a named project manager.
  • Matching tiles, slate and brick sourced for a roofline that fits the street.
  • Scaffold access through the roof, so the house stays usable.

Planning and building control in Windsor

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission.

In England most loft conversions on houses are permitted development: the added roof volume must stay within 40 cubic metres on a terraced house or 50 cubic metres on a semi-detached or detached house, nothing may sit higher than the existing ridge or project forward of the roof slope facing the road, and materials must be similar in appearance. Flats, maisonettes and houses on designated land such as conservation areas do not have these rights.

Building regulations approval is always needed. Building control checks the structure, fire safety, stairs, insulation, ventilation and electrics and issues a completion certificate at the end.

How the work runs

  1. Free home survey

    A surveyor measures the loft, checks head height and roof structure and talks through what you want from the room.

  2. Design and fixed quote

    You receive layout options and a written, itemised price that does not change unless you change the design.

  3. Drawings and engineer's calculations

    Our design team produces the plans and the structural engineer specifies beams and joists.

  4. Finish and certificate

    Plastering, second fix, decorating and the final inspection, after which you receive the completion certificate.

Dormer Loft Conversions in Windsor: your questions

How much is a dormer loft conversion in Windsor?

Our guide price in Windsor is £48,000 to £74,000 including VAT. A fixed quote follows a survey of your loft.

Do I need planning permission in Windsor?

Rear dormers on houses usually fall within permitted development, subject to volume limits; front dormers facing a road normally need planning permission. We confirm the position with the local planning authority before work starts.

Can I stay in the house during the work?

Yes. Most work is done from scaffolding through the roof. The staircase installation is the main period of disruption indoors.

Can a dormer go on the front of the house?

It can, but a front dormer that faces a road is outside permitted development, so it needs planning permission and is usually a smaller pitched-roof design.

How long does a dormer loft conversion take?

Most dormer conversions take 6 to 10 weeks on site once drawings and approvals are in place. Design, structural calculations and any party wall notices usually add six to ten weeks before the start.

Call usGet a quote