Loft Conversions in Belfast
For a loft conversion in Belfast, expect a guide price of £22,000 to £83,500 including VAT and around 4 to 14 weeks on site. One company handles design, approvals and construction.
- Free home survey
- Fixed written quote
- Drawings and engineer included
- Building control handled
- UK-wide teams

Loft conversion prices in Belfast
Belfast is a major city in Greater Belfast. Our surveyors cover the whole area, so a visit can usually be arranged within a few days.
| Service | Guide price inc. VAT | On site |
|---|---|---|
| Dormer Loft Conversions | £36,000 to £55,500 | 6 to 10 wks |
| Hip to Gable Loft Conversions | £44,500 to £67,000 | 8 to 12 wks |
| Mansard Loft Conversions | £51,500 to £81,500 | 10 to 14 wks |
| Rooflight Loft Conversions | £21,500 to £32,500 | 4 to 6 wks |
| L-Shaped Dormer Loft Conversions | £49,500 to £75,500 | 9 to 13 wks |
| Bungalow Loft Conversions | £38,500 to £73,000 | 8 to 12 wks |
| Terraced House Loft Conversions | £36,000 to £58,500 | 6 to 10 wks |
| Semi-Detached Loft Conversions | £41,000 to £64,500 | 8 to 12 wks |
| Truss Roof Loft Conversions | £38,500 to £61,500 | 7 to 11 wks |
| Loft Bedroom with En-Suite | £41,000 to £64,500 | 8 to 11 wks |
| Loft Home Office Conversions | £24,000 to £44,500 | 4 to 8 wks |
| Loft Conversion Design and Planning | £2,100 to £6,400 | 6 to 12 wks |
| Shell-Only Loft Conversions | £20,500 to £38,500 | 3 to 6 wks |
| Loft Conversion Regularisation | £1,300 to £21,400 | 2 to 8 wks |
Homes and roofs in Belfast
Semi-detached houses with hipped roofs in the suburbs suit hip to gable conversions.
Roofs are commonly concrete tile or slate, and dormers are usually finished to match.
Planning and building control
In Northern Ireland, permitted development rules for roof changes are set out in the Planning (General Permitted Development) Order (Northern Ireland) 2015. Some rear dormers and roof windows on houses qualify, and others need planning permission from the local council.
Building regulations approval from the council's Building Control service is required, with inspections during the work and a completion certificate at the end.
Why use us in Belfast?
- Snagging visit after completion.
- One contract for design, approvals and building, with a named project manager.
- Stage payments tied to completed work, not dates.
- Written, itemised quote after a free survey.
- Building regulations inspections booked and attended by us.
- Daily tidy-up and floor protection on the route to the loft.
Nearby towns
Loft conversions in Belfast: your questions
How long will the work take?
A loft conversion typically takes 4 to 14 weeks on site. Weather and any changes you make to the design can alter that.
Do I need planning permission in Belfast?
Most loft conversions on houses can be built without a planning application, but flats, protected areas and larger roof changes need one. We confirm the position with the local council planning office before work starts.
How soon can you start in Belfast?
Design and approvals usually take six to ten weeks. Building work in Greater Belfast is then scheduled for the next available start date, which we confirm in writing.
Who deals with building control in Belfast?
We do. We make the application, book each inspection with the council's Building Control service and hand you the completion certificate at the end.
Will a loft conversion suit my house in Belfast?
Most houses can be converted. The checks are head height under the ridge, roof pitch, the type of roof structure and where the stairs can go. We measure all four at the survey.